Each component of the Bushlight India Model has been extensively documented. The purpose of doing so was to be able to specify a standardised approach that people could be readily trained in and easily replicated. Process guides, user manuals, hardware interfaces, fixed document formats, and structured design and analysis tools based on international best practice are the ways in which quality and consistency of information and approach can be maintained during the rigours of actual implementation in the field. The following table details all of the major resources and tools developed by the Bushlight India Project and which underpin the Bushlight India Model. They are sorted according the stage of the model they apply to.
If you are interested in accessing any of these resources please contact us.
VILLAGE SELECTION |
|
| Village Selection Protocol Selection process document including selection criteria and instructions on how to assess the results. Discussion on the rationale and theory behind the criteria also included. |
|
| Bushlight India financial modeling tool Excel spreadsheet with explanatory manual. Includes two main sheets: system design and financial, with a results page; designed for input of key system design and cost variables with outputs including system cash flows over the 15 year life of the system. |
|
VILLAGE ENERGY PLANNING |
|
![]() |
Village Energy Planning - Facilitators Manual Comprehensive manual for facilitators of the Village Energy Planning (VEP) component of the Bushlight India Model including an overall description of the model and where the VEP fits in it, an overview of Bushlight India systems, and sequential, step by step instructions on how to carry out each stage of the VEP process, with checklists, example images and image of all required resources. Templates for village resolutions and institutional management structures also included along with a suggested Service Terms and Conditions agreement. |
![]() |
Bushlight India Village Energy Service Delivery Model – process poster Large banner showing each step of the Bushlight India Model, from the introductory meetings of the VEP through to post installation operation and management; including main involved parties. This is a key resource used during the VEP. Oriya and Bangla versions. |
|
Bushlight India System Overview Poster Large banner showing the layout and major components of a Bushlight India village solar energy system, including key parties. This is a key resource used during the VEP. Oriya, Bangla and Hindi versions. |
|
Energy Services and Appliances Poster Large banner showing the link between fuels, energy, energy services, appliances and how much energy appliances use. This introduces the blue star concept and is a key resource used during the VEP. Oriya, Bangla and Hindi versions. |
|
Entrepreneur Development Support Process Poster Large banner showing each step in the Entrepreneur Development Support Process (EDSP), a complimentary activity to the main VEP, designed to be run concurrently with the aim of supporting new and existing business development through energy provision. |
|
Livelihood Activity Cards Set of 39, A5 size laminated cards showing a range of livelihood activities undertaken in remote villages. Used as part of the Education and Information component of the VEP to explore what energy services people use and need. Oriya, Bangla and Hindi versions. |
|
System Architecture Poster Small format (A3) image showing all the components of a Bushlight India village solar energy system and how they fit together. Used during the VEP for information purposes. Oriya and Bangla versions. |
|
Urja Bandhu Operation Poster Small format (A3) image showing the basic function and operation of the Urja Bandhu. Oriya, Bangla and Hindi versions. |
|
Business Activity Cards Small format (A3) cards showing business establishment and operation cycles for four small business types. These are used as part of the EDSP to explore the inputs, costs activities involved in operating and managing a small business. |
|
Energy Service Level Charts |
|
Example Village Layout Map Example map provided to the local facilitators of the VEP for reference when preparing a village map. |
|
Village Survey Survey form used during the village survey component of the VEP for the collection of community level data about location, access, festivals and existing community structures. This information feeds into the Detailed Village Profile and the system design process. |
|
Energy Budget Survey Survey form for use during the energy budgeting component of the VEP. Including forms for households, commercial establishments and community buildings, the survey looks at building occupancy and use, livelihoods, income and expenditure and current energy use. Survey is done in conjunction with actual energy budgets. |
|
Menu of Appliances A3 format chart showing the main appliance icons and their relative energy consumption (in blue stars) for time used. This is used as a reference chart during the construction of energy budgets. Oriya, Bangla and Hindi versions. |
|
Appliance Icon Stickers A3 sheets of stickers of appliances icons and their relative energy consumption (in blue stars) for time used. These are cut out and used to construct individual energy budgets on floorplans. Stickers are stuck down when final budgets are agreed. Oriya, Bangla and Hindi versions. |
|
Energy Budget Floorplans A3 sheets on which basic information about the building and its occupants are documented, a floorplan is drawn and an energy budget constructed using the Appliances Icon Stickers. Final Budget service level is identified and an agreement between the user and the system owner signed on the reverse. (filled in version shown) Oriya, Bangla and Hindi versions. |
|
Detailed Village Profile (DVP) Excel spreadsheet wherein data collected during the VEP is entered and collated into a final report document which is used as the main reference for the system design process. The DVP holds all the baseline information for any future impact assessment. |
SYSTEM DESIGN | |
|
System Design Parameters Report documenting the system design parameters and modalities used to design Bushlight India village solar energy systems, including source of input data and an insight into the methodology of the design process. |
|
System Design Tool Excel spreadsheet, standardized system design tool based on international best practice, specifically developed for the Bushlight India Model. Utilising information from the DVP, this tool has been developed to design cost-effective, optimized PV based energy systems that meet the electrical energy needs identified during the VEP. |
|
Life Cycle Costing Tool Excel spreadsheet analysis tool comparing the life cycle costs of various options for village electrification for any one site: a Bushlight India village solar energy system; individual solar home systems, diesel generator system, and grid connection. |
|
Lighting Comparison Chart A3 chart showing the various pro’s and con’s of the various luminaire options. This is a reference document developed to assist in the selection of luminaires to be used. |
TENDERING |
|
|
Supply and Installation Tender Tender document including detailed specifications (text and all drawings) of all civil works as well as all materials to be supplied and how and where they are to be installed. Also includes contract documentation for the supply and installation of the system and details regarding timelines, quality of work, experience and skills of contractors and sub-contractors, payments schedules and milestones, and resolution processes should services rendered not be as quoted, amongst other things. |
|
System Maintenance Tender Tender document including detailed specifications regarding the cost and regularity of scheduled maintenance services to be provided, as well as a scope of works, and the arrangements and costs associated with provision of unscheduled maintenance services. |
INSTALLATION |
|
|
Urja Bandhu Installation Manual Image based guide showing the procedure to follow to correctly and safely install an Urja Bandhu. |
|
Bushlight India: System Control Board – Operation and Maintenance Manual Comprehensive image based guide to the operation and maintenance of the System Control Board (SCB) installed in Maligaon including detailed guides for the programming of the programmable logic computer (PLC) and human machine interface (HMI) within the SCB. |
|
Signage: Full System Shutdown Laminated sign, fixed to the front of the Power Conditioning Unit (PCU) describing the procedure for correctly shutting the system down – electrically isolating all the main components. Oriya and Bangla versions. |
|
Signage: System start‐up procedure Laminated sign, fixed to the front of PCU describing the procedure for correctly turning the system on after a full system shutdown. Oriya and Bangla versions. |
|
Signage: Generator start‐up procedure Laminated poster describing the procedure for using a generator to charge the system batteries. Oriya and Bangla versions. |
|
Signage: Generator shutdown procedure Laminated poster describing the procedure for stopping a generator, disconnecting it from the system, and reconnecting power supply to the village. Oriya and Bangla versions. |
|
Bushlight India village solar energy system Commissioning Checklist Checklist of all components of the supply and installation as taken from the scope of works component of the contract. This is a tool to ensure all work meets the standards as laid out in the supply and installation contract; and to apply a quality verification process during commissioning which ensures that any work not meeting these standards is identified for rectification before a final certificate of completion is issued. |
OPERATION AND SUPPORT |
|
|
“village name” Village Energy Plan Large format, site specific, image based overview of the Bushlight India system installed in “Village”: its major components and details of the system capacity, layout and connections. In English and local language. |
|
Bushlight Village Solar Energy System: Operation, Maintenance and Troubleshooting Manual Comprehensive image based guide to the operation and maintenance of the Bushlight India system installed in “Village” including a basic troubleshooting guide. In English and local language. |
|
Bushlight India: System Logbook – Village: “village name” Carbon copy logbook for use by the local system operator containing instructions for required daily, weekly and monthly maintenance tasks and consecutive pages for recording completion of activities and meter readings etc. Each book records 1 year of operation. 15 books supplied per system. Oriya and Bangla versions. |
|
Bushlight India: Urja Bandhu – Operation, Maintenance and Troubleshooting manual Comprehensive image based guide to the operation and maintenance of Urja Bandhus including a basic troubleshooting guide and basic wiring diagrams. |
|
Energy Budget Agreements Compendium of all energy budgets in the village. Each page shows the household/ building, gives the name and the service level, has an image of the completed energy budget floorplan and a scanned copy of the signed agreement. This is for the management committee/cooperative, however individual copies also go each consumer. |
|
Energy Budget Posters A3 laminated posters of each household, showing the consumer holding their completed energy budget agreement with the selected service level shown in text and blue stars. Individual copies go to each consumer. |
|
|
Energy Budget Tracking Chart Logbook used for tracking the energy budgets allocated to the various connection throughout the village. It includes a system layout map showing all connections and a list of all consumers (image, name and number) and a list of building numbers with current budget. Used for monitoring budgets as they change to ensure total allocation does not exceed system capacity. |
|
Bushlight India Village Solar Energy System – “Village” Technical Manual Site specific manual providing a complete and ready resource to the system owner to assist them in the ongoing operation and maintenance of their system including: an overview of the design and function of a Bushlight India system; Safety; System design summary; Descriptions and technical specification of key system components; Operation procedures; Maintenance procedures; Bill of Materials; Spare Parts; Component Warranty Information; Commissioning Records; System Layout Diagrams; Equipment Documentation. |
OTHER TECHNICAL RESOURCES FROM EQUIPMENT SUPPLIERS (as required to be supplied on site) |
|
|
User Manual – “Village” Site specific Operation and Maintenance Manual supplied by the installation contractor. Should contain technical information about all supplied hardware, including drawings and specification sheets, as well as information on safety and general system operation and maintenance. |
|
Technical Manual – Single Phase DSP based HPC Technical manual supplied by OPSI (Kolkata) to describe complex aspects of the operation of the PCU. |
|
O&M Manual – Single Phase DSP based HPC Operation and maintenance manual supplied by OPSI to describe the installation and operation of the PCU. |
|
OPS Coms User Manual User manual supplied by OPSI to describe the installation and operation of local and remote communications with PCU. |